Project Overview

General Contractor
Lockheed Martin
Scope
Audio and Visual Engineering design and Implementation Services
Lockheed Martin logo

MCS surveyed the existing AV systems in both the Gaithersburg, MD and the Crystal City, VA locations to become familiarized with the installed systems. On a room-by-room basis, MCS traced the existing CFE cabling systems and rack-mounted equipment that were currently installed. MCS completed cable terminations and connections need to be re-terminated, as needed, and properly labeled. All system integration and professional cable management were performed by MCS in accordance with industry-accepted standards and best practices. MCS provided engineering estimates for design solutions that complemented existing installations in the two locations. The design included CAD floor plans, cable pull list, labeling/wiring schematics.